In the operation of the generator in what inspection should be done
Update:2017-02-18 Tags:generator

In the operationdiesel generator set of the generator in what inspection should be done, for normal inspection tour of the running generator is the necessary condition to ensure long-term safe operation of generator. In the normal tour operators to run the generator to do the following check:

1) check the generator temperature and vibration of each part.

2) check the excitation system, especially to check the operation condition of the slip ring and commutator.

3) check whether there is any vibration on the stator winding end wear and heat become angry phenomenon.

4) check the cooler for the leakage and frost and so on.